The requirement
As part of an upgrade to the permanent catering facilities at Oakey Army Base, project contractor FKG required a temporary kitchen and dining solution to maintain AAFCANS food service operations throughout the construction period.
The temporary facilities needed to provide a fully functional commercial kitchen and comfortable dining area for Defence personnel, ensuring catering services could continue without interruption during the six-month refurbishment.
Our solution
Mobile Kitchens supplied and installed temporary modular commercial kitchen and dining facilities to support AAFCANS operations throughout the upgrade works.
The facilities provided dedicated food preparation, cooking and dining areas, allowing catering services to operate independently of the construction activities.
The temporary solution remained operational for six months, enabling the permanent facilities to be upgraded while maintaining essential food services for personnel at Oakey Army Base.
The project demonstrates Mobile Kitchens’ experience in delivering temporary catering infrastructure for Australian Defence facilities, ensuring operational continuity during major construction and refurbishment projects.
Equipment and features
- Hotline kitchen
- Triple stores module
- Warewashing module